Installing form for pond weir.

Hickenbottom drain.

Excavating SWM pond.

Back-filling utility trench.

Connecting high pressure water pipe.

Preparing base for generator slab.

Installing large tile drains.

Building access road.

Utility trench back-fill.

Staging area for GNSS.

DC trench to inverter building.

Inverter pad forming.

Finished generator station concrete.

Topsoil stripping for compound area.

Pouring transformer pad.

Pouring duct bank.